The planned renovations at the Long Island Rail Road’s Facility include 50,000 sq. ft expansion of the existing facility and new sections of rail road track embedded in the concrete slab-on-grade. These sections of track will allow rail bound equipment to be serviced within the facility.

Yu & Associates (YU) was retained as the Environmental Engineer to investigate and obtain subsurface information to screen soil and groundwater for potential contamination within the vicinity of the proposed construction. Field exploration work plan and Health & Safety Plan preparation, document research, boring and sampling analyses, data evaluation, and engineering reports were included among YU’s scope of work. YU prepared construction specifications for the excavation and handling of waste materials to minimize costs associated with the potential environmental risks. YU also performed geotechnical boring inspection and prepared boring logs for the contractor.

Location:

Jamaica, Queens,
New York

Services:

  • Environmental Engineering
  • Field Exploration Work Plan
  • Environmental Sampling
  • Geotechnical Boring Inspections
  • Analysis and Reports
  • Construction Specifications
Client:
Parsons Brinckerhoff
Owner:
MTA Long Island Rail Road